Remediation: Tracy Defense Depot


Client: Gilbane Building Company

Location: Tracy, CA

PROJECT DETAILS
  • Construction of a 360,000 square foot raised “dock high” concrete tilt up warehouse surrounded by 172,000 square feet of asphalt pavement and concrete aprons.
  • Construction of 295,000 square foot paved truck storage area
  • Demolished existing site improvements and crushed 25,000 tons of concrete into ¾” Class 2 aggregate base to be used in the new improvements.
  • Project required the moving of approximately 32,000 cubic yards of material from a nearby source to build the 4 foot elevated building pad and approximately 45,000 tons of class 2 AB and 12,000 tons of asphalt.
  • Oversaw the installation of over $1,000,000 of underground improvements.
  • Duration of the project:  22 months
  • Project Contract:  $4,750,000.