Remediation: Block 5 Tower



Client: Condon Johnson

Location: San Francisco, CA

PROJECT DETAILS

Construction of a 47 story commercial building in downtown San Francisco with 2 below grade levels of parking.

Project required the digging of a 40 foot excavation removing 42,000 cubic yards of material.  As part of the excavation, the demolition of the former Beale Street freeway onramp foundations were required to be demolished and removed.